BidJudge.com - Projects
  • Zak Dirt Inc
  • 2026
  • 12
  • 3
  • 25.00%
  • $37,227,769
  • 2.92%
  • 18.11%
  • 10.59%
  • $70,203,833
contact@zakdirt.com
14290 Hilltop Road
Longmont CO
80504
970-535-4657
970-535-4561
Health Breakdown
Avg Left
50
Success
40
Avg Avg
5
Year Proj
50
2 Year Prior Proj
Qual Based
0
Cash Flow
-40
 
105%
100%
Health
AI Cash Flow & Backlog Analysis
Zak Dirt Inc (Powered by Grok AI)
When Will Cash Flow Drop?

The major cash flow decline is expected when high-completion projects begin winding down and the large Peoria project becomes the primary revenue source.

Short-Term (Next 3-6 Months):
Cash flow is expected to remain stable or increase slightly as new projects continue ramping up.

Medium-Term (6-12 Months):
Several projects will approach completion, reducing revenue diversification.

Potential Major Risk Period:
Late 2026 through Mid-2027.

Recommended Action:
Begin securing additional work within the next 3-4 months.

How Much New Work Is Needed?

To maintain approximately $4.5M monthly cash flow, the contractor should maintain 18-24 months of active backlog.

Current remaining backlog is approximately $104M, representing about 22-23 months of work at the current burn rate.

Recommendation:
- Secure $40M-$60M in new backlog over the next 6-9 months.
- Target $20M-$30M of new work before year-end.
- Prioritize contracts that can start between Q4 2026 and Q2 2027.
- Maintain a minimum backlog of $80M-$100M to avoid significant cash flow reductions.
 
JOBS LOW
  • Region 4 US 287 Intersection Improvements FSA 2873-233 (27210)
  • CDOT
  • 4/9/26
  • Pace Street Rough Ready Trail Improvements
  • Longmont
  • 3/11/26
  • Region 3 I70 Frisco Exit 203 Off Ramp Widening NHPP 0702-422 (24873)
  • CDOT
  • 2/5/26
Bidjudge
JOBS BID
  • Weld County Road 34 Bridge Replacement
  • Mead
  • $1,167,796
  • 5/11/26
  • Region 4 US 287 Intersection Improvements FSA 2873-233 (27210)
  • CDOT
  • $6,384,774
  • 4/9/26
  • Region 2 Highway Intersection Improvements STR 0711-024 (25539R)
  • CDOT
  • $4,218,046
  • 4/9/26
  • PW2026 01 2026 Rock Creek Parkway Improvements
  • Superior - CO
  • $5,396,644
  • 3/12/26
  • Pace Street Rough Ready Trail Improvements
  • Longmont
  • $3,728,506
  • 3/11/26
  • Mountain Shadows Trail
  • Firestone
  • $141,924
  • 2/17/26
  • Grandview Boulevard Improvements Phase 2
  • Dacono
  • $2,205,359
  • 2/10/26
  • Region 3 I70 Frisco Exit 203 Off Ramp Widening NHPP 0702-422 (24873)
  • CDOT
  • $27,114,489
  • 2/5/26
  • Region 2 SH 115 Concrete Preventative Maintenance STR 1151-043 (26371)
  • CDOT
  • $3,769,755
  • 2/5/26
  • Gartrell Bridge Widening
  • Aurora
  • $9,671,372
  • 1/21/26
  • Water Quality Infrastructure Improvements
  • Denver International Airport
  • $4,066,172
  • 1/13/26
  • Trilby Bridge Replacement
  • Fort Collins
  • $2,338,996
  • 1/8/26
Bidjudge
CASH FLOW
  • Trilby Bridge Replacement
  • CDOT
  • $6,384,774
  • 06/08/26
  • 150
  • 9.3%
  • $1,276,955
  • $5,788,862
  • Trilby Bridge Replacement
  • Longmont
  • $3,728,506
  • 05/10/26
  • 120
  • 35.0%
  • $932,127
  • $2,423,529
  • Trilby Bridge Replacement
  • CDOT
  • $27,114,489
  • 04/06/26
  • 730
  • 10.4%
  • $1,114,294
  • $24,291,611
  • $3,323,376
  • $32,504,002
Bidjudge