Access the Full Project by Clicking here!
Bidjugde
JOB
Paving Improvements
BID DATE
06/10/26 - 7:00
AGENCY
Florence - CO
ESTIMATE
n/a
SCOPE
West Front Street project will consist of placing a 3-inch compacted mat of hot bituminous pavement. The work will also include the removal and replacement of 8-inch curb and gutter, along with the installation of six driveway cuts and one pedestrian (walking) cut. All driveway and pedestrian cuts must be constructed to match existing driveway grades and conditions. Additionally, any pavement markings disturbed or removed during construction will be replaced.Furnish and install all necessary materials, measuring, accessories, components, traffic control, safety barriers, equipment, tools, labor, other necessary items, disposal of related debris, and cleanup services needed to install the hot bituminous pavement on various streets within the City of Florence. Cortlyne.huppe@florencecolorado.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT